ITAC Assessment: IA0039
ITAC logo
ITAC Assessment: IA0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SCHOOL BUSES
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 1,920
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,760 1,636,284
kWh
Natural Gas $70,161 17,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $6,617 $15,000 $(-1,115.0)
(-13,775)
kWh
$7,732
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $744 $600 - $744
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,769 $360 $1,769
21,981
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $322 $73 $520
6,448
kWh
- $(-198.0)
TOTAL RECOMMENDED $9,452 $16,033 $1,174
14,654
kWh
$8,476
-
MMBtu
$(-198.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs