ITAC Assessment: UD0616
ITAC logo
ITAC Assessment: UD0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Motor Vehicle Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 60,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,421 1,562,120
kWh
Electricity Demand $69,224 4,920
kW-mo/yr
Natural Gas $12,702 2,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $331,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 3.1161: Eliminate/reduce an operation $252,000 $75,000 - - - - - $252,000 - -
02 4.125: $52,440 $1,200 - - - - - $35,280 - $17,160
03 2.4224: Upgrade controls on compressors $10,581 $12,000 $2,021
72,171
kWh
$6,247
-
kW-mo/yr
$2,313
-
MMBtu
- - - - -
04 3.5112: Reprocess spent oils on site for re-use $12,893 $3,200 - - - $3,983
-
gal
- - $8,910 -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,612 $3,000 - - - - $1,612
-
lb
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $2,412 $269
9,600
kWh
$675
-
kW-mo/yr
- - - - - -
07 2.7124: Make a practice of turning off lights when not needed $637 - $181
6,480
kWh
$456
-
kW-mo/yr
- - - - - -
08 2.7261: Install timers and/or thermostats $495 $1,200 $190
2,641
kWh
- $305
-
MMBtu
- - - - -
TOTAL RECOMMENDED $331,602 $98,012 $2,661
90,892
kWh
$7,378
-
kW-mo/yr
$2,618
-
MMBtu
$3,983
-
gal
$1,612
-
lb
$287,280 $8,910 $17,160
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs