Assessment Year | 1996 |
---|---|
Principal Product | Fiberglass Boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
170,000
ft2
|
Annual Production | 750
pieces
|
Production Hrs. Annual | 2,880
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,036 | 1,763,189 |
kWh
|
$0.070 |
Electricity Demand | $38,713 | 5,607 |
kW-mo/yr
|
$6.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $3,437 | $300 |
$2,442
34,877
kWh
|
$995
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,440 | $1,980 |
$1,017
14,654
kWh
|
$423
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,019 | $1,350 |
$5,019
55,100
kWh
|
- | - | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $2,912 | $3,214 |
$2,141
30,481
kWh
|
$771
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $3,670 | $3,500 |
$2,833
40,445
kWh
|
$837
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.8132: Use less toxic and volatile solvent substitutes | $7,670 | - | - | - |
$2,000
-
gal
|
- | - | $5,670 | - | |
07 | 4.445: Install equipment to move product | $10,057 | $6,250 | - | - | - | $10,057 | - | - | - | |
08 | 4.321: Optimize production lot sizes and inventories | $8,475 | $8,488 | - | - | - | - | $6,975 | - | $1,500 | |
TOTAL RECOMMENDED | $42,680 | $25,082 |
$13,452
175,557
kWh
|
$3,026
-
kW-mo/yr
|
$2,000
-
gal
|
$10,057 | $6,975 | $5,670 | $1,500 | ||
TOTAL IMPLEMENTED | $21,516 | $18,532 |
$11,010
140,680
kWh
|
$2,031
-
kW-mo/yr
|
- | - | $6,975 | - | $1,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs