ITAC Assessment: UD0569
ITAC logo
ITAC Assessment: UD0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product sheet metal stampings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,850 3,559,496
kWh
Electricity Demand $176,438 12,540
kW-mo/yr
Natural Gas $67,635 14,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $177,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.5131: Recycle white water $90,440 - - - - $90,440 -
02 3.2176: Increase use of automation $65,250 - - - - - $65,250
03 4.431: Train operators for maximum operating efficiency $8,400 $2,500 - - $8,400 - -
04 2.7111: Reduce illumination to minimum necessary levels $7,058 $12,380 $2,851
129,543
kWh
$4,207
-
kW-mo/yr
- - -
05 2.4226: Use / purchase optimum sized compressor $6,848 $632 $2,407
109,320
kWh
$4,441
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $177,996 $15,512 $5,258
238,863
kWh
$8,648
-
kW-mo/yr
$8,400 $90,440 $65,250
TOTAL IMPLEMENTED $72,098 $632 $2,407
109,320
kWh
$4,441
-
kW-mo/yr
- - $65,250
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs