ITAC Assessment: UD0549
ITAC logo
ITAC Assessment: UD0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Die sets for can tooling
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $1
M
to 5
M
# of Employees 43
Plant Area 13,000
ft2
Annual Production 4,800
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,096 773,154
kWh
Electricity Demand $24,482 1,740
kW-mo/yr
Natural Gas $1,419 271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $342,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.112: Replace old machine with new automatic multi-station tool $322,350 $250,000 - - - - $35,700 - $286,650
02 4.432: Cross-train personnel to avoid lost time $12,682 - - - - - $12,682 - -
03 3.3128: Utilize other methods to remove contaminants $3,343 $1,000 - - - $225
-
gal
$306 $2,812 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,070 $3,903 $1,043
40,152
kWh
$1,027
-
kW-mo/yr
- - - - -
05 2.4226: Use / purchase optimum sized compressor $736 - $736
28,429
kWh
- - - - - -
06 2.2437: Recover waste heat from equipment $624 $500 - - $624
-
MMBtu
- - - -
07 2.6231: Utilize controls to operate equipment only when needed $204 $250 $103
4,103
kWh
$101
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $342,009 $255,653 $1,882
72,684
kWh
$1,128
-
kW-mo/yr
$624
-
MMBtu
$225
-
gal
$48,688 $2,812 $286,650
TOTAL IMPLEMENTED $14,042 $500 $736
28,429
kWh
- $624
-
MMBtu
- $12,682 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs