Assessment Year | 2007 |
---|---|
Principal Product | Electronic Products |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677: Electronic Coils, Transformers, and Other Inductors |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
152,781
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $210,527 | 1,999,282 |
kWh
|
$0.11 |
Electricity Demand | $62,437 | 6,931 |
kW-mo/yr
|
$9.01 |
Electricity Fees | $11,505 | - |
|
- |
Natural Gas | $130,490 | 10,187 |
MMBtu
|
$12.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,089 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $12,666 | - |
$10,972
104,499
kWh
|
$1,694
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $696 | - |
$624
5,940
kWh
|
$72
-
kW-mo/yr
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $243 | - |
$162
1,539
kWh
|
$81
-
kW-mo/yr
|
- | - | - | |
04 | 2.4314: Use synthetic lubricant | $82 | - |
$55
520
kWh
|
$27
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,654 | $425 |
$6,843
65,171
kWh
|
$811
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,593 | $191 |
$1,422
13,541
kWh
|
$171
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,133 | $587 |
$2,097
19,968
kWh
|
$1,036
-
kW-mo/yr
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $1,717 | $348 | - | - |
$1,717
-
MMBtu
|
- | - | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $13,604 | $3,502 | - | - |
$13,604
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $727 | $519 |
$377
3,592
kWh
|
$45
-
kW-mo/yr
|
- | $140 | $165 | |
11 | 2.2136: Install / repair insulation on steam lines | $38 | $36 | - | - |
$38
-
MMBtu
|
- | - | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $498 | $530 |
$498
4,747
kWh
|
- | - | - | - | |
13 | 2.7135: Install occupancy sensors | $157 | $321 |
$157
1,498
kWh
|
- | - | - | - | |
14 | 2.2437: Recover waste heat from equipment | $1,281 | $6,030 | - | - |
$1,281
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $44,089 | $12,489 |
$23,207
221,015
kWh
|
$3,937
-
kW-mo/yr
|
$16,640
-
MMBtu
|
$140 | $165 | ||
TOTAL IMPLEMENTED | $26,334 | $5,390 |
$10,315
98,228
kWh
|
$2,072
-
kW-mo/yr
|
$13,642
-
MMBtu
|
$140 | $165 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs