Assessment Year | 2021 |
---|---|
Principal Product | Yarn |
NAICS | 313110: Fiber, Yarn, and Thread Mills |
SIC | 2281: Yarn Spinning Mills |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
150,000
ft2
|
Annual Production | 150,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,111 | 1,228,511 |
kWh
|
$0.053 |
Electricity Demand | $10,993 | 3,739 |
kW-mo/yr
|
$2.94 |
Electricity Fees | $25,187 | - |
|
- |
Fuel Oil #2 | $6,128 | 307 |
MMBtu
|
$19.96 |
TOTAL YEARLY COSTS | $107,419 | |||
RECOMMENDED SAVINGS* | $24,351 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,227 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,744 | $200 |
$1,606
30,123
kWh
|
$138
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,099 | $7,600 |
$3,704
69,888
kWh
|
$395
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $384 | $1,200 |
$346
6,526
kWh
|
$38
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,301 | $19,000 |
$4,569
86,204
kWh
|
$732
-
kW-mo/yr
|
- | - | |
05 | 2.1332: Convert combustion equipment to burn natural gas | $3,549 | $13,500 | - | - |
$196
-
MMBtu
|
$3,353 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,274 | $37,000 |
$7,995
150,858
kWh
|
$1,279
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $24,351 | $78,500 |
$18,220
343,599
kWh
|
$2,582
-
kW-mo/yr
|
$196
-
MMBtu
|
$3,353 | ||
TOTAL IMPLEMENTED | $6,227 | $9,000 |
$5,656
106,537
kWh
|
$571
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs