Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 150,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,111 1,228,511
kWh
Electricity Demand $10,993 3,739
kW-mo/yr
Electricity Fees $25,187 -
Fuel Oil #2 $6,128 307
MMBtu
TOTAL YEARLY COSTS $107,419
RECOMMENDED SAVINGS* $24,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,744 $200 $1,606
30,123
kWh
$138
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,099 $7,600 $3,704
69,888
kWh
$395
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $384 $1,200 $346
6,526
kWh
$38
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,301 $19,000 $4,569
86,204
kWh
$732
-
kW-mo/yr
- -
05 2.1332: Convert combustion equipment to burn natural gas $3,549 $13,500 - - $196
-
MMBtu
$3,353
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,274 $37,000 $7,995
150,858
kWh
$1,279
-
kW-mo/yr
- -
TOTAL RECOMMENDED $24,351 $78,500 $18,220
343,599
kWh
$2,582
-
kW-mo/yr
$196
-
MMBtu
$3,353
TOTAL IMPLEMENTED $6,227 $9,000 $5,656
106,537
kWh
$571
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs