ITAC Assessment: UD0534
ITAC logo
ITAC Assessment: UD0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Centrifugals
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 140,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,390
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,242 1,575,322
kWh
Electricity Demand $46,651 5,172
kW-mo/yr
Natural Gas $53,152 10,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $3,360 $6,000 - - - - - $1,440
-
lb
- $1,920 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,347 $29,176 $4,277
98,769
kWh
$4,070
-
kW-mo/yr
- - - - - - -
03 2.4226: Use / purchase optimum sized compressor $9,860 $600 $1,790
41,325
kWh
$1,377
-
kW-mo/yr
$703
-
MMBtu
- $5,990
-
Tgal
- - - -
04 2.4224: Upgrade controls on compressors $789 $400 - - - - $789
-
Tgal
- - - -
05 2.7261: Install timers and/or thermostats $7,454 $1,400 - - $7,454
-
MMBtu
- - - - - -
06 4.322: Eliminate old stock and modify inventory control $8,275 - - - - - - - $78,400 $4,875 $(-75,000.0)
07 4.212: Adopt in-house material generation $35,000 $75,000 - - - $(-5,000.0)
-
MMBtu
- - $(-20,000.0) - $60,000
08 3.3133: Use other waste concentration methods $2,932 $500 - - - - - $3,252
-
lb
$(-320.0) - -
TOTAL RECOMMENDED $76,017 $113,076 $6,067
140,094
kWh
$5,447
-
kW-mo/yr
$8,157
-
MMBtu
$(-5,000.0)
-
MMBtu
$6,779
-
Tgal
$4,692
-
lb
$58,080 $6,795 $(-15,000.0)
TOTAL IMPLEMENTED $50,801 $105,576 $4,277
98,769
kWh
$4,070
-
kW-mo/yr
$7,454
-
MMBtu
$(-5,000.0)
-
MMBtu
- - $(-20,000.0) - $60,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings