ITAC Assessment: UW2313
ITAC logo
ITAC Assessment: UW2313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Apples, Cherries, Pears
NAICS 111331: Apple Orchards
SIC 0175: Deciduous Tree Fruits
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 530,000
ft2
Annual Production 518,750,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,708 18,853,224
kWh
Electricity Demand $108,455 30,551
kW-mo/yr
Electricity Fees $25,911 -
Natural Gas $126,607 12,753
MMBtu
Waste Disposal Costs
Water Usage $536,843 79,505
Tgal
TOTAL YEARLY COSTS $1,071,524
RECOMMENDED SAVINGS* $523,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $523,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 3.4115: Recover and reuse cooling water $513,763 $28,215 - - $513,763
-
Tgal
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,760 $2,080 $5,062
349,086
kWh
$1,698
-
kW-mo/yr
-
03 2.4321: Upgrade obsolete equipment $2,813 $10,637 $1,728
119,165
kWh
$1,085
-
kW-mo/yr
-
TOTAL RECOMMENDED $523,336 $40,932 $6,790
468,251
kWh
$2,783
-
kW-mo/yr
$513,763
-
Tgal
TOTAL IMPLEMENTED $523,336 $40,932 $6,790
468,251
kWh
$2,783
-
kW-mo/yr
$513,763
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs