ITAC Assessment: UD0431
ITAC logo
ITAC Assessment: UD0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product machining centers, EDMs
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 130,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,803 7,790,446
kWh
Natural Gas $148,258 28,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $20,078 $28,500 $20,078
-
kWh
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $18,567 $2,000 - $18,567
-
Tgal
-
03 2.6218: Turn off equipment when not in use $6,565 $5,000 $6,295
297,186
kWh
- $270
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,395 $2,500 $7,395
100,234
kWh
- -
05 2.8113: Purchase gas directly from a contract gas supplier $53,070 $50,000 - - $53,070
TOTAL RECOMMENDED $105,675 $88,000 $33,768
397,420
kWh
$18,567
-
Tgal
$53,340
TOTAL IMPLEMENTED $99,110 $83,000 $27,473
100,234
kWh
$18,567
-
Tgal
$53,070
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs