ITAC Assessment: TN0517
ITAC logo
ITAC Assessment: TN0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Polyurethane Foam Rubber
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 165,000
ft2
Annual Production 54,575,000
lb
Production Hrs. Annual 4,463
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,549 1,402,403
kWh
Natural Gas $36,340 4,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,223 $8,688 $5,223
87,046
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,213 $1,080 $1,213
20,223
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $668 - $668
11,137
kWh
-
04 2.2511: Insulate bare equipment $274 $130 - $274
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $229 $250 $229
3,810
kWh
-
06 2.3212: Optimize plant power factor $2,785 $4,000 $2,785
-
kWh
-
TOTAL RECOMMENDED $10,392 $14,148 $10,118
122,216
kWh
$274
-
MMBtu
TOTAL IMPLEMENTED $6,436 $9,768 $6,436
107,269
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs