Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $1
M
to 5
M
# of Employees 220
Plant Area
n/a
Annual Production 750,000,000
pieces
Production Hrs. Annual 6,640
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,483 4,946,952
kWh
Natural Gas $8,362 1,929
MMBtu
LPG $2,103 175
MMBtu
Other Energy $12,126 1,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $2,222 $3,000 $2,222
-
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $1,311 $1,500 $1,311
56,272
kWh
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $4,426 $7,600 - $4,426
-
MMBtu
-
04 2.6232: Install set-back timers $5,440 - $4,427
189,918
kWh
- $1,013
TOTAL RECOMMENDED $13,399 $12,100 $7,960
246,190
kWh
$4,426
-
MMBtu
$1,013
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs