Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Adhesive Bandages
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 100,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,506 2,813,706
kWh
Electricity Demand $49,596 6,009
kW-mo/yr
Electricity Fees $13,011 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $9,064 $170 $7,139
139,968
kWh
$1,925
-
kW-mo/yr
- - - -
02 2.7221: Lower temperature during the winter season and vice-versa $6,450 $96 $3,916
76,776
kWh
$2,534
-
kW-mo/yr
- - - -
03 2.8114: Change rate schedules or other changes in utility service $4,432 $100 - - - - - $4,432
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,973 $862 $3,135
61,472
kWh
$1,174
-
kW-mo/yr
- - $(-336.0) -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $1,003 $22 - - - $1,091
-
lb
- $(-88.0)
06 2.7132: Install timers on light switches in little used areas $849 $769 $849
16,650
kWh
- - - - -
07 2.4314: Use synthetic lubricant $714 $52 $653
12,805
kWh
- $8
-
gal
- - $53
TOTAL RECOMMENDED $26,485 $2,071 $15,692
307,671
kWh
$5,633
-
kW-mo/yr
$8
-
gal
$1,091
-
lb
$(-336.0) $4,397
TOTAL IMPLEMENTED $21,204 $1,202 $14,843
291,021
kWh
$5,633
-
kW-mo/yr
$8
-
gal
$1,091
-
lb
$(-336.0) $(-35.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs