ITAC Assessment: UD0309
ITAC logo
ITAC Assessment: UD0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PRINTED MATERIALS
NAICS
n/a
SIC 2721: Periodicals: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,435 5,434,936
kWh
Natural Gas $115,631 27,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $13,076 $18,000 $13,076
-
kWh
-
02 2.7261: Install timers and/or thermostats $3,951 $700 - $3,951
-
MMBtu
03 2.7229: Air condition only space necessary $1,295 $200 - $1,295
-
MMBtu
04 2.2437: Recover waste heat from equipment $3,374 $8,000 $2,049
20,809
kWh
$1,325
-
MMBtu
05 2.6232: Install set-back timers $900 $500 $1,019
14,068
kWh
$(-119.0)
-
MMBtu
06 2.2614: Use cooling tower or economizer to replace chiller cooling $8,028 $10,000 $8,028
242,380
kWh
-
TOTAL RECOMMENDED $30,624 $37,400 $24,172
277,257
kWh
$6,452
-
MMBtu
TOTAL IMPLEMENTED $13,274 $10,900 $8,028
242,380
kWh
$5,246
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs