Assessment Year | 2009 |
---|---|
Principal Product | Fabricated Pipe and Pipe Fittings |
NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 120 |
Plant Area |
320,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 2,750
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,857 | 3,511,498 |
kWh
|
$0.075 |
Natural Gas | $16,311 | 997 |
MMBtu
|
$16.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,107 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,116 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,812 | $41,878 |
$9,812
131,580
kWh
|
|
02 | 2.7134: Use photocell controls | $3,768 | $1,894 |
$3,768
59,792
kWh
|
|
03 | 2.7261: Install timers and/or thermostats | $2,044 | $510 |
$2,044
27,403
kWh
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,868 | - |
$2,868
38,465
kWh
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,910 | $1,500 |
$2,910
39,030
kWh
|
|
06 | 2.4224: Upgrade controls on compressors | $1,573 | $300 |
$1,573
21,096
kWh
|
|
07 | 2.2437: Recover waste heat from equipment | $3,782 | $1,385 |
$3,782
50,721
kWh
|
|
08 | 2.2511: Insulate bare equipment | $350 | $610 |
$350
4,196
kWh
|
|
TOTAL RECOMMENDED | $27,107 | $48,077 |
$27,107
372,283
kWh
|
||
TOTAL IMPLEMENTED | $15,116 | $44,498 |
$15,116
202,209
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs