| Assessment Year | 1986 |
|---|---|
| Principal Product | ELECTRICAL CONNECTORS |
| NAICS |
n/a
|
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 8,000,000
lb
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $332,077 | 5,517,292 |
kWh
|
$0.060 |
| Natural Gas | $106,254 | 21,928 |
MMBtu
|
$4.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,803 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3511: Use plant owned transformers or lease transformers | $3,915 | $20,000 |
$8,715
-
kWh
|
- | $(-4,800.0) | |
| 02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $16,515 | - | - |
$16,515
-
MMBtu
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $6,218 | - |
$8,144
211,606
kWh
|
$(-1,926.0)
-
MMBtu
|
- | |
| 04 | 2.6242: Minimize operation of equipment maintained in standby condition | $7,322 | $10,000 |
$7,322
163,834
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $7,926 | $9,000 | - |
$7,926
-
MMBtu
|
- | |
| 06 | 2.7442: Keep doors and windows shut when not on use | $2,822 | $2,070 |
$2,870
83,236
kWh
|
$(-759.0)
-
MMBtu
|
$711 | |
| TOTAL RECOMMENDED | $44,718 | $41,070 |
$27,051
458,676
kWh
|
$21,756
-
MMBtu
|
$(-4,089.0) | ||
| TOTAL IMPLEMENTED | $40,803 | $21,070 |
$18,336
458,676
kWh
|
$21,756
-
MMBtu
|
$711 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs