ITAC Assessment: BD0490
ITAC logo
ITAC Assessment: BD0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plastic wiring products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,311 1,745,880
kWh
Electricity Demand $84,524 4,386
kW-mo/yr
Electricity Fees $23,357 -
Natural Gas $7,771 1,812
MMBtu
Waste Disposal Costs
Water Usage $1,697 479
Tgal
Water Disposal $2,437 479
Tgal
TOTAL YEARLY COSTS $217,097
RECOMMENDED SAVINGS* $36,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $14,526 $1,150 $8,726
156,682
kWh
$5,800
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $7,997 $2,000 $4,273
76,728
kWh
$3,191
-
kW-mo/yr
- $213 $320
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,025 $2,501 $2,417
43,381
kWh
$1,608
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,902 $3,069 $2,344
42,066
kWh
$1,558
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $2,072 $1,500 $803
14,414
kWh
$399
-
kW-mo/yr
$870
-
MMBtu
- -
06 2.7231: Use radiant heater for spot heating $1,813 $1,100 - - $1,813
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $643 $300 $383
6,877
kWh
$260
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $630 $800 $158
2,832
kWh
$472
-
kW-mo/yr
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $478 $20 $287
5,146
kWh
$191
-
kW-mo/yr
- - -
10 2.4221: Install compressor air intakes in coolest locations $394 $400 $238
4,266
kWh
$156
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $36,480 $12,840 $19,629
352,392
kWh
$13,635
-
kW-mo/yr
$2,683
-
MMBtu
$213 $320
TOTAL IMPLEMENTED $4,532 $3,869 $2,502
44,898
kWh
$2,030
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs