ITAC Assessment: UD0159
ITAC logo
ITAC Assessment: UD0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SOFT TRIM INTERIOR PARTS
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,454 1,587,046
kWh
Natural Gas $40,059 6,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,024

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $812 - $812
29,308
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $219 $580 $219
3,224
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,687 $218 $1,915
27,843
kWh
$(-228.0)
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,961 - $1,961
-
kWh
-
05 2.2437: Recover waste heat from equipment $345 $920 - $345
-
MMBtu
TOTAL RECOMMENDED $5,024 $1,718 $4,907
60,375
kWh
$117
-
MMBtu
TOTAL IMPLEMENTED $5,024 $1,718 $4,907
60,375
kWh
$117
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs