| Assessment Year | 2002 |
|---|---|
| Principal Product | Snack Foods |
| NAICS |
n/a
|
| SIC | 2094: |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
250,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $265,911 | 10,063,499 |
kWh
|
$0.026 |
| Electricity Demand | $125,929 | 17,268 |
kW-mo/yr
|
$7.29 |
| Electricity Fees | $65,265 | - |
|
- |
| Natural Gas | $940,070 | 227,675 |
MMBtu
|
$4.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,203 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,747 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7145: Install skylights | $12,317 | $7,800 |
$5,094
159,120
kWh
|
$7,223
-
kW-mo/yr
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $680 | $545 |
$501
15,655
kWh
|
$179
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,839 | $2,400 |
$1,132
35,374
kWh
|
$707
-
kW-mo/yr
|
- | - | |
| 04 | 2.2515: Use optimum thickness insulation | $8,790 | $2,670 | - | - |
$8,790
-
MMBtu
|
- | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $17,300 | $18,000 |
$(-394.0)
(-12,319)
kWh
|
$(-359.0)
-
kW-mo/yr
|
$18,053
-
MMBtu
|
- | |
| 06 | 2.2522: Isolate hot or cold equipment | $12,399 | $22,269 | - | - |
$12,399
-
MMBtu
|
- | |
| 07 | 3.5313: Increase amount of waste recovered for resale | $10,878 | $6,350 | - | - | - |
$10,878
-
lb
|
|
| TOTAL RECOMMENDED | $64,203 | $60,034 |
$6,333
197,830
kWh
|
$7,750
-
kW-mo/yr
|
$39,242
-
MMBtu
|
$10,878
-
lb
|
||
| TOTAL IMPLEMENTED | $32,747 | $31,834 |
$501
15,655
kWh
|
$179
-
kW-mo/yr
|
$21,189
-
MMBtu
|
$10,878
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs