ITAC Assessment: UU0019
ITAC logo
ITAC Assessment: UU0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Snack Foods
NAICS
n/a
SIC 2094:
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,911 10,063,499
kWh
Electricity Demand $125,929 17,268
kW-mo/yr
Electricity Fees $65,265 -
Natural Gas $940,070 227,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7145: Install skylights $12,317 $7,800 $5,094
159,120
kWh
$7,223
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $680 $545 $501
15,655
kWh
$179
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,839 $2,400 $1,132
35,374
kWh
$707
-
kW-mo/yr
- -
04 2.2515: Use optimum thickness insulation $8,790 $2,670 - - $8,790
-
MMBtu
-
05 2.7243: Improve air circulation with destratification fans / other methods $17,300 $18,000 $(-394.0)
(-12,319)
kWh
$(-359.0)
-
kW-mo/yr
$18,053
-
MMBtu
-
06 2.2522: Isolate hot or cold equipment $12,399 $22,269 - - $12,399
-
MMBtu
-
07 3.5313: Increase amount of waste recovered for resale $10,878 $6,350 - - - $10,878
-
lb
TOTAL RECOMMENDED $64,203 $60,034 $6,333
197,830
kWh
$7,750
-
kW-mo/yr
$39,242
-
MMBtu
$10,878
-
lb
TOTAL IMPLEMENTED $32,747 $31,834 $501
15,655
kWh
$179
-
kW-mo/yr
$21,189
-
MMBtu
$10,878
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs