ITAC Assessment: UD0069
ITAC logo
ITAC Assessment: UD0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product DIE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,375
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,206 1,548,066
kWh
Natural Gas $210,857 46,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,154 $272 $1,395
24,326
kWh
$(-241.0)
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $257 $500 $257
4,103
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,195 $3,000 $1,757
29,308
kWh
$(-562.0)
-
MMBtu
04 2.7441: Replace broken windows and/or window sash $2,157 $2,629 - $2,157
-
MMBtu
TOTAL RECOMMENDED $4,763 $6,401 $3,409
57,737
kWh
$1,354
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs