Assessment Year | 1982 |
---|---|
Principal Product | DIE CASTINGS |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,206 | 1,548,066 |
kWh
|
$0.061 |
Natural Gas | $210,857 | 46,790 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,763 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,154 | $272 |
$1,395
24,326
kWh
|
$(-241.0)
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $257 | $500 |
$257
4,103
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,195 | $3,000 |
$1,757
29,308
kWh
|
$(-562.0)
-
MMBtu
|
|
04 | 2.7441: Replace broken windows and/or window sash | $2,157 | $2,629 | - |
$2,157
-
MMBtu
|
|
TOTAL RECOMMENDED | $4,763 | $6,401 |
$3,409
57,737
kWh
|
$1,354
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs