ITAC Assessment: KG0046
ITAC logo
ITAC Assessment: KG0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product gaskets and fasteners
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 23,650
ft2
Annual Production 0
units
Production Hrs. Annual 4,030
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,648 710,434
kWh
Electricity Demand $28,474 2,047
kW-mo/yr
Electricity Fees $876 -
Natural Gas $929 212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,929 $1,400 $2,044
63,013
kWh
$4,063
-
kW-mo/yr
$(-1,178.0)
-
MMBtu
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $4,874 $700 $1,516
46,893
kWh
$4,232
-
kW-mo/yr
$(-874.0)
-
MMBtu
- -
03 2.2511: Insulate bare equipment $1,845 $48 $1,845
6,448
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,157 $365 $429
13,189
kWh
$728
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $880 $50 $383
11,723
kWh
$497
-
kW-mo/yr
- - -
06 2.7261: Install timers and/or thermostats $684 $450 $684
21,102
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $455 $500 $455
14,068
kWh
- - - -
08 2.7135: Install occupancy sensors $240 $290 $240
7,327
kWh
- - - -
09 2.6218: Turn off equipment when not in use $244 $150 $244
7,620
kWh
- - - -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,088 $800 - - - $3,088
-
gal
-
11 3.8121: Cover containers to minimize evaporative losses $2,130 $300 - - - $2,130
-
gal
-
12 3.5316: Contract a wood pallet recycling company $2,356 - - - - - $2,356
-
lb
13 3.5248: Separate and recycle scrap metal to foundry or for sale $1,437 - - - - - $1,437
-
lb
TOTAL RECOMMENDED $24,319 $5,053 $7,840
191,383
kWh
$9,520
-
kW-mo/yr
$(-2,052.0)
-
MMBtu
$5,218
-
gal
$3,793
-
lb
TOTAL IMPLEMENTED $13,152 $2,463 $3,413
54,807
kWh
$728
-
kW-mo/yr
- $5,218
-
gal
$3,793
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs