ITAC Assessment: UD0030
ITAC logo
ITAC Assessment: UD0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SHAMPOO, LIQUID SOAPS
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $500
k
to 1
M
# of Employees 42
Plant Area
n/a
Annual Production 650,000
pieces
Production Hrs. Annual 2,808
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,763 401,231
kWh
Natural Gas $37,809 11,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,014 - - $1,014
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $116 $250 $116
1,758
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $995 $210 $995
15,240
kWh
-
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,084 $1,000 $1,084
16,706
kWh
-
05 2.7441: Replace broken windows and/or window sash $4,094 $3,008 - $4,094
-
MMBtu
TOTAL RECOMMENDED $7,303 $4,468 $2,195
33,704
kWh
$5,108
-
MMBtu
TOTAL IMPLEMENTED $6,103 $3,218 $995
15,240
kWh
$5,108
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs