ITAC Assessment: UC2609
ITAC logo
ITAC Assessment: UC2609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Precious Metals, Cyanide Salts
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $100
M
to 500
M
# of Employees 116
Plant Area 80,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $736,181 7,093,553
kWh
Electricity Demand $303,610 21,217
kW-mo/yr
Electricity Fees $3,984 -
Natural Gas $600,341 33,979
MMBtu
Waste Disposal Costs
Water Usage $88,316 4,842
Tgal
TOTAL YEARLY COSTS $1,732,431
RECOMMENDED SAVINGS* $216,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $8,428 $3,524 $6,499
62,615
kWh
$1,929
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $630 $325 $522
5,031
kWh
$108
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,514 - $3,623
34,905
kWh
$1,891
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $796 $2,333 - - $796
-
MMBtu
-
05 2.2511: Insulate bare equipment $1,484 $3,900 - - $1,484
-
MMBtu
-
06 2.7135: Install occupancy sensors $2,973 $10,400 $2,841
27,372
kWh
$132
-
kW-mo/yr
- -
07 4.231: Purchase equipment instead of leasing $192,000 $160,000 - - - $192,000
08 2.7314: Reduce ventilation air $4,550 $7,067 $3,608
34,759
kWh
$942
-
kW-mo/yr
- -
TOTAL RECOMMENDED $216,375 $187,549 $17,093
164,682
kWh
$5,002
-
kW-mo/yr
$2,280
-
MMBtu
$192,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs