| Assessment Year | 2026 |
|---|---|
| Principal Product | Precious Metals, Cyanide Salts |
| NAICS | 331410: Nonferrous Metal (except Aluminum) Smelting and Refining |
| SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
| Sales Range | $100 M to 500M |
| # of Employees | 116 |
| Plant Area |
80,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 6,336
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $736,181 | 7,093,553 |
kWh
|
$0.10 | |
| Electricity Demand | $303,610 | 21,217 |
kW-mo/yr
|
$14.31 | |
| Electricity Fees | $3,984 | - |
|
- | |
| Natural Gas | $600,341 | 33,979 |
MMBtu
|
$17.67 | |
| Waste Disposal Costs | |||||
| Water Usage | $88,316 | 4,842 |
Tgal
|
$18.24 | |
| TOTAL YEARLY COSTS | $1,732,431 | ||||
| RECOMMENDED SAVINGS* | $216,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $8,428 | $3,524 |
$6,499
62,615
kWh
|
$1,929
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $630 | $325 |
$522
5,031
kWh
|
$108
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,514 | - |
$3,623
34,905
kWh
|
$1,891
-
kW-mo/yr
|
- | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $796 | $2,333 | - | - |
$796
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $1,484 | $3,900 | - | - |
$1,484
-
MMBtu
|
- | |
| 06 | 2.7135: Install occupancy sensors | $2,973 | $10,400 |
$2,841
27,372
kWh
|
$132
-
kW-mo/yr
|
- | - | |
| 07 | 4.231: Purchase equipment instead of leasing | $192,000 | $160,000 | - | - | - | $192,000 | |
| 08 | 2.7314: Reduce ventilation air | $4,550 | $7,067 |
$3,608
34,759
kWh
|
$942
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $216,375 | $187,549 |
$17,093
164,682
kWh
|
$5,002
-
kW-mo/yr
|
$2,280
-
MMBtu
|
$192,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs