ITAC Assessment: UC2601
ITAC logo
ITAC Assessment: UC2601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Automotive Timing Chain and Components
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 450,000
ft2
Annual Production 75,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,745,478 21,529,200
kWh
Electricity Demand $284,903 40,185
kW-mo/yr
Electricity Fees $9,396 -
Natural Gas $59,460 5,378
MMBtu
TOTAL YEARLY COSTS $3,099,237
RECOMMENDED SAVINGS* $202,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $104 $303 $104
818
kWh
- - -
02 2.2437: Recover waste heat from equipment $73,769 $9,905 - - - $73,769
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $23,854 $30,000 $21,837
171,276
kWh
$2,017
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,281 $1,365 $3,049
23,915
kWh
$232
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $2,654 $20,000 $2,460
19,294
kWh
$194
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $60,580 $184,500 $56,292
441,504
kWh
$4,288
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $11,998 $7,750 $11,998
94,102
kWh
- - -
08 2.7135: Install occupancy sensors $12,838 $3,840 $12,666
99,338
kWh
$172
-
kW-mo/yr
- -
09 2.7124: Make a practice of turning off lights when not needed $4,711 - $4,478
35,123
kWh
$232
-
kW-mo/yr
- -
10 2.3212: Optimize plant power factor $8,766 $30,464 - - $8,766 -
TOTAL RECOMMENDED $202,555 $288,127 $112,884
885,370
kWh
$7,135
-
kW-mo/yr
$8,766 $73,769
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs