ITAC Assessment: UC2513
ITAC logo
ITAC Assessment: UC2513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Surgical supplies
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 50,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,800
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,743 416,215
kWh
Electricity Demand $33,755 1,294
kW-mo/yr
Electricity Fees $7,222 -
Natural Gas $11,197 906
MMBtu
TOTAL YEARLY COSTS $117,917
RECOMMENDED SAVINGS* $17,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $621 $198 $520
3,289
kWh
$102
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,824 $75 $6,489
41,069
kWh
$2,336
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $928 $870 $756
4,787
kWh
$171
-
kW-mo/yr
- - -
04 2.7261: Install timers and/or thermostats $926 $2,780 $185
1,170
kWh
- $1,141
-
MMBtu
- $(-400.0)
05 2.8121: Apply for tax-free status for energy purchases $6,546 - - - - $6,546 -
TOTAL RECOMMENDED $17,845 $3,923 $7,950
50,315
kWh
$2,608
-
kW-mo/yr
$1,141
-
MMBtu
$6,546 $(-400.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs