ITAC Assessment: ME0140
ITAC logo
ITAC Assessment: ME0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Woolen Cloth
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 7,700
ft2
Annual Production 14,349
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $828,374 9,109,027
kWh
Fuel Oil #6 $168,736 81,814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $7,095 $5,760 $7,095
78,546
kWh
- -
02 2.2514: Cover open tanks $2,550 $1,310 - $2,550
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $4,670 $250 $4,670
50,703
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $952 $65 - $952
-
MMBtu
-
05 2.7135: Install occupancy sensors $356 $300 $356
3,810
kWh
- -
06 2.7135: Install occupancy sensors $1,672 $550 $1,672
18,464
kWh
- -
07 2.2511: Insulate bare equipment $679 $269 - $679
-
MMBtu
-
08 2.2163: Use minimum steam operating pressure $969 $50 - $969
-
MMBtu
-
09 4.231: Purchase equipment instead of leasing $9,610 $28,250 - - $9,610
TOTAL RECOMMENDED $28,553 $36,804 $13,793
151,523
kWh
$5,150
-
MMBtu
$9,610
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs