Assessment Year | 1994 |
---|---|
Principal Product | Woolen Cloth |
NAICS |
n/a
|
SIC | 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing) |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
7,700
ft2
|
Annual Production | 14,349
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $828,374 | 9,109,027 |
kWh
|
$0.091 |
Fuel Oil #6 | $168,736 | 81,814 |
MMBtu
|
$2.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $7,095 | $5,760 |
$7,095
78,546
kWh
|
- | - | |
02 | 2.2514: Cover open tanks | $2,550 | $1,310 | - |
$2,550
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,670 | $250 |
$4,670
50,703
kWh
|
- | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $952 | $65 | - |
$952
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $356 | $300 |
$356
3,810
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,672 | $550 |
$1,672
18,464
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $679 | $269 | - |
$679
-
MMBtu
|
- | |
08 | 2.2163: Use minimum steam operating pressure | $969 | $50 | - |
$969
-
MMBtu
|
- | |
09 | 4.231: Purchase equipment instead of leasing | $9,610 | $28,250 | - | - | $9,610 | |
TOTAL RECOMMENDED | $28,553 | $36,804 |
$13,793
151,523
kWh
|
$5,150
-
MMBtu
|
$9,610 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs