ITAC Assessment: UC2315
ITAC logo
ITAC Assessment: UC2315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial heating equipment
NAICS 333994: Industrial Process Furnace and Oven Manufacturing
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 47,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,428 396,383
kWh
Electricity Demand $35,396 1,578
kW-mo/yr
Electricity Fees $3,764 -
Natural Gas $7,408 395
MMBtu
TOTAL YEARLY COSTS $86,997
RECOMMENDED SAVINGS* $75,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8123: Pay utility bills on time $269 - - - $269 - - - -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $354 $222 $272
2,665
kWh
$82
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,868 $11,165 $3,781
37,066
kWh
$4,263
-
kW-mo/yr
- - - $(-267.1) $91
04 2.4221: Install compressor air intakes in coolest locations $323 $855 $248
2,434
kWh
$75
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $534 $75 $410
4,023
kWh
$124
-
kW-mo/yr
- - - - -
06 2.4239: Eliminate or reduce compressed air usage $2,231 $150 $1,715
16,811
kWh
$517
-
kW-mo/yr
- - - - -
07 2.7261: Install timers and/or thermostats $1,770 $559 $112
1,100
kWh
$34
-
kW-mo/yr
- $1,624
-
MMBtu
- - -
08 2.7232: Replace existing hvac unit with high efficiency model $3,601 $25,290 $(-650.8)
(-6,381)
kWh
$(-511.3)
-
kW-mo/yr
- $4,763
-
MMBtu
- - -
09 2.7234: Use heat pump for space conditioning $5,665 $31,002 $(-998.4)
(-9,789)
kWh
$(-615.4)
-
kW-mo/yr
- $7,279
-
MMBtu
- - -
10 2.3192: Use fossil fuel powered generator during peak demand periods $3,746 $34,025 $367
3,600
kWh
$111
-
kW-mo/yr
$4,200 $(-931.8)
-
MMBtu
- - -
11 2.9114: Use solar heat to make electricty $29,189 $268,543 $29,189
286,167
kWh
- - - - - -
12 2.3141: Use battery storage for demand control $9,576 $41,370 $(-867.5)
(-8,505)
kWh
$10,766
-
kW-mo/yr
$(-322.8) - - - -
13 4.212: Adopt in-house material generation $10,809 $60,198 $(-2,920.5)
(-28,634)
kWh
$(-878.8)
-
kW-mo/yr
- - $14,608 - -
TOTAL RECOMMENDED $75,935 $473,454 $30,657
300,557
kWh
$13,966
-
kW-mo/yr
$4,147 $12,734
-
MMBtu
$14,608 $(-267.1) $91
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs