Assessment Year | 2023 |
---|---|
Principal Product | Industrial heating equipment |
NAICS | 333994: Industrial Process Furnace and Oven Manufacturing |
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
47,000
ft2
|
Annual Production | 90,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,428 | 396,383 |
kWh
|
$0.10 |
Electricity Demand | $35,396 | 1,578 |
kW-mo/yr
|
$22.43 |
Electricity Fees | $3,764 | - |
|
- |
Natural Gas | $7,408 | 395 |
MMBtu
|
$18.76 |
TOTAL YEARLY COSTS | $86,997 | |||
RECOMMENDED SAVINGS* | $75,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $269 | - | - | - | $269 | - | - | - | - | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $354 | $222 |
$272
2,665
kWh
|
$82
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,868 | $11,165 |
$3,781
37,066
kWh
|
$4,263
-
kW-mo/yr
|
- | - | - | $(-267.1) | $91 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $323 | $855 |
$248
2,434
kWh
|
$75
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $534 | $75 |
$410
4,023
kWh
|
$124
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,231 | $150 |
$1,715
16,811
kWh
|
$517
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.7261: Install timers and/or thermostats | $1,770 | $559 |
$112
1,100
kWh
|
$34
-
kW-mo/yr
|
- |
$1,624
-
MMBtu
|
- | - | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $3,601 | $25,290 |
$(-650.8)
(-6,381)
kWh
|
$(-511.3)
-
kW-mo/yr
|
- |
$4,763
-
MMBtu
|
- | - | - | |
09 | 2.7234: Use heat pump for space conditioning | $5,665 | $31,002 |
$(-998.4)
(-9,789)
kWh
|
$(-615.4)
-
kW-mo/yr
|
- |
$7,279
-
MMBtu
|
- | - | - | |
10 | 2.3192: Use fossil fuel powered generator during peak demand periods | $3,746 | $34,025 |
$367
3,600
kWh
|
$111
-
kW-mo/yr
|
$4,200 |
$(-931.8)
-
MMBtu
|
- | - | - | |
11 | 2.9114: Use solar heat to make electricty | $29,189 | $268,543 |
$29,189
286,167
kWh
|
- | - | - | - | - | - | |
12 | 2.3141: Use battery storage for demand control | $9,576 | $41,370 |
$(-867.5)
(-8,505)
kWh
|
$10,766
-
kW-mo/yr
|
$(-322.8) | - | - | - | - | |
13 | 4.212: Adopt in-house material generation | $10,809 | $60,198 |
$(-2,920.5)
(-28,634)
kWh
|
$(-878.8)
-
kW-mo/yr
|
- | - | $14,608 | - | - | |
TOTAL RECOMMENDED | $75,935 | $473,454 |
$30,657
300,557
kWh
|
$13,966
-
kW-mo/yr
|
$4,147 |
$12,734
-
MMBtu
|
$14,608 | $(-267.1) | $91 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs