ITAC Assessment: UA3027
ITAC logo
ITAC Assessment: UA3027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Refurbishing Vacuum Pumps
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 20,000
ft2
Annual Production 250
units
Production Hrs. Annual 3,276
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,435 296,480
kWh
Electricity Demand $35,341 5,999
kW-mo/yr
Electricity Fees $4,441 -
Natural Gas $10,835 829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $3,385 $8,470 - - - $3,385
-
MMBtu
02 2.7261: Install timers and/or thermostats $978 $330 $208
2,026
kWh
- $12 $758
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $5,732 $15,725 $4,329
42,151
kWh
$1,090
-
kW-mo/yr
$313 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,525 $400 $1,110
10,811
kWh
$332
-
kW-mo/yr
$83 -
05 2.3212: Optimize plant power factor $5,898 $6,420 - $5,575
-
kW-mo/yr
$323 -
TOTAL RECOMMENDED $17,518 $31,345 $5,647
54,988
kWh
$6,997
-
kW-mo/yr
$731 $4,143
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs