| Assessment Year | 2012 |
|---|---|
| Principal Product | Vehicle Sub-frame |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 650 |
| Plant Area |
493,000
ft2
|
| Annual Production | 340,000
pieces
|
| Production Hrs. Annual | 7,800
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,257,005 | 18,231,044 |
kWh
|
$0.069 |
| Electricity Fees | $10,084 | - |
|
- |
| Natural Gas | $12,453 | 1,076 |
MMBtu
|
$11.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $201,093 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,444 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $90,505 | $55,107 |
$87,455
1,268,386
kWh
|
$3,050 | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $27,110 | $2,162 |
$26,196
379,928
kWh
|
$914 | |
| 03 | 2.7261: Install timers and/or thermostats | $9,242 | $680 |
$8,931
129,529
kWh
|
$311 | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,914 | $180 |
$1,849
26,823
kWh
|
$65 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $28,652 | $2,400 |
$27,687
401,555
kWh
|
$965 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $26,924 | $9,695 |
$26,017
377,338
kWh
|
$907 | |
| 07 | 2.7122: Disconnect ballasts | $6,783 | $1,013 |
$6,555
95,073
kWh
|
$228 | |
| 08 | 2.7122: Disconnect ballasts | $4,820 | $810 |
$4,658
67,552
kWh
|
$162 | |
| 09 | 2.7122: Disconnect ballasts | $3,927 | $810 |
$3,795
55,042
kWh
|
$132 | |
| 10 | 2.7132: Install timers on light switches in little used areas | $1,216 | $430 |
$1,175
17,035
kWh
|
$41 | |
| TOTAL RECOMMENDED | $201,093 | $73,287 |
$194,318
2,818,261
kWh
|
$6,775 | ||
| TOTAL IMPLEMENTED | $17,444 | $2,813 |
$16,857
244,490
kWh
|
$587 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs