Assessment Year | 2010 |
---|---|
Principal Product | Truck Bodies |
NAICS | 336212: Truck Trailer Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
110,000
ft2
|
Annual Production | 1,300
pieces
|
Production Hrs. Annual | 4,538
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,181 | 4,553,700 |
kWh
|
$0.076 |
Electricity Demand | $4,444 | 1,112 |
kW-mo/yr
|
$4.00 |
Natural Gas | $190,816 | 13,573 |
MMBtu
|
$14.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $217,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $159,004 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $30,246 | $34,285 |
$26,517
347,814
kWh
|
$3,729
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,085 | $42,861 |
$23,751
311,521
kWh
|
$3,334
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $2,974 | $730 |
$2,974
39,004
kWh
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $9,502 | $20,000 |
$8,720
114,379
kWh
|
$782
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $9,061 | $5,448 | - | - |
$9,061
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,840 | $400 |
$4,439
58,228
kWh
|
$401
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,333 | $1,000 |
$1,688
22,134
kWh
|
$645
-
kW-mo/yr
|
- | |
08 | 2.1321: Replace fossil fuel equipment with electrical equipment | $122,417 | $2,400 | - | - |
$122,417
-
MMBtu
|
|
09 | 2.6218: Turn off equipment when not in use | $6,056 | $2,750 | - | - |
$6,056
-
MMBtu
|
|
10 | 2.7261: Install timers and/or thermostats | $2,972 | $510 |
$2,972
38,987
kWh
|
- | - | |
TOTAL RECOMMENDED | $217,486 | $110,384 |
$71,061
932,067
kWh
|
$8,891
-
kW-mo/yr
|
$137,534
-
MMBtu
|
||
TOTAL IMPLEMENTED | $159,004 | $65,261 |
$32,471
425,900
kWh
|
$4,116
-
kW-mo/yr
|
$122,417
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs