Assessment Year | 2023 |
---|---|
Principal Product | Fiberglass Mat |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 54 |
Plant Area |
130,000
ft2
|
Annual Production | 52,000,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,619,652 | 19,683,315 |
kWh
|
$0.082 | |
Electricity Demand | $444,312 | 29,621 |
kW-mo/yr
|
$15.00 | |
Electricity Fees | $(-329,102.0) | - |
|
- | |
Natural Gas | $1,452,713 | 259,705 |
MMBtu
|
$5.59 | |
Waste Disposal Costs | |||||
Water Usage | $60,993 | 6,875 |
Tgal
|
$8.87 | |
Water Disposal | $98,727 | 6,875 |
Tgal
|
$14.36 | |
TOTAL YEARLY COSTS | $3,347,295 | ||||
RECOMMENDED SAVINGS* | $173,418 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $83,920 | $6,036 | - | - | - | - |
$83,920
-
Tgal
|
|
02 | 2.2437: Recover waste heat from equipment | $61,473 | $64,976 | - | - | - |
$61,473
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $9,308 | $327 |
$233
2,829
kWh
|
- | $(-37.0) |
$9,112
-
MMBtu
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,819 | $1,680 |
$5,456
66,289
kWh
|
$3,847
-
kW-mo/yr
|
$(-1,484.0) | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,935 | $1,000 |
$5,028
61,090
kWh
|
$1,365
-
kW-mo/yr
|
$(-458.0) | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,416 | $8,163 |
$2,259
27,452
kWh
|
$615
-
kW-mo/yr
|
$(-458.0) | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $777 | $4,000 |
$730
8,866
kWh
|
$195
-
kW-mo/yr
|
$(-148.0) | - | - | |
08 | 2.7135: Install occupancy sensors | $1,770 | $1,055 |
$2,106
25,590
kWh
|
- | $(-336.0) | - | - | |
TOTAL RECOMMENDED | $173,418 | $87,237 |
$15,812
192,116
kWh
|
$6,022
-
kW-mo/yr
|
$(-2,921.0) |
$70,585
-
MMBtu
|
$83,920
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs