ITAC Assessment: UA0278
ITAC logo
ITAC Assessment: UA0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fiberglass Mat
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 54
Plant Area 130,000
ft2
Annual Production 52,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,619,652 19,683,315
kWh
Electricity Demand $444,312 29,621
kW-mo/yr
Electricity Fees $(-329,102.0) -
Natural Gas $1,452,713 259,705
MMBtu
Waste Disposal Costs
Water Usage $60,993 6,875
Tgal
Water Disposal $98,727 6,875
Tgal
TOTAL YEARLY COSTS $3,347,295
RECOMMENDED SAVINGS* $173,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $83,920 $6,036 - - - - $83,920
-
Tgal
02 2.2437: Recover waste heat from equipment $61,473 $64,976 - - - $61,473
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $9,308 $327 $233
2,829
kWh
- $(-37.0) $9,112
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,819 $1,680 $5,456
66,289
kWh
$3,847
-
kW-mo/yr
$(-1,484.0) - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,935 $1,000 $5,028
61,090
kWh
$1,365
-
kW-mo/yr
$(-458.0) - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,416 $8,163 $2,259
27,452
kWh
$615
-
kW-mo/yr
$(-458.0) - -
07 2.4221: Install compressor air intakes in coolest locations $777 $4,000 $730
8,866
kWh
$195
-
kW-mo/yr
$(-148.0) - -
08 2.7135: Install occupancy sensors $1,770 $1,055 $2,106
25,590
kWh
- $(-336.0) - -
TOTAL RECOMMENDED $173,418 $87,237 $15,812
192,116
kWh
$6,022
-
kW-mo/yr
$(-2,921.0) $70,585
-
MMBtu
$83,920
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs