ITAC Assessment: ND0198
ITAC logo
ITAC Assessment: ND0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Electronics/Pneumatics; Aluminum Stampings & Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 92
Plant Area 42,400
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,351 1,706,624
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,906 $1,523 $3,906
40,739
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,740 $750 $1,740
17,878
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,053 $1,556 $1,053
11,723
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $950 $420 $950
10,258
kWh
- -
05 3.1244: Reduce solution drag-out to prevent solution loss $870 $800 - - $870
06 2.7135: Install occupancy sensors $598 $90 $598
5,862
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $155 $100 - $155
-
MMBtu
-
TOTAL RECOMMENDED $9,272 $5,239 $8,247
86,460
kWh
$155
-
MMBtu
$870
TOTAL IMPLEMENTED $4,959 $3,079 $4,959
52,462
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs