Assessment Year | 2019 |
---|---|
Principal Product | Cast Concrete Poles |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
51,289
ft2
|
Annual Production | 9,500
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $115,092 | 1,376,140 |
kWh
|
$0.084 | |
Electricity Fees | $4,335 | - |
|
- | |
Natural Gas | $98,441 | 8,736 |
MMBtu
|
$11.27 | |
Waste Disposal Costs | |||||
Water Usage | $8,782 | 2,240 |
Tgal
|
$3.92 | |
TOTAL YEARLY COSTS | $226,650 | ||||
RECOMMENDED SAVINGS* | $61,932 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,657 | $5,249 |
$1,595
19,815
kWh
|
$62 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,748 | $100 |
$3,607
44,813
kWh
|
$141 | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $24,940 | $40,000 |
$24,002
298,234
kWh
|
$938 | - | |
04 | 2.2135: Repair and eliminate steam leaks | $11,264 | $1,950 | - | - |
$11,264
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $65 | $137 |
$62
776
kWh
|
$3 | - | |
06 | 2.7231: Use radiant heater for spot heating | $14,354 | $20,922 |
$28,242
350,903
kWh
|
$1,104 |
$(-14,992.0)
-
MMBtu
|
|
07 | 2.7135: Install occupancy sensors | $5,904 | $1,169 |
$5,682
70,606
kWh
|
$222 | - | |
TOTAL RECOMMENDED | $61,932 | $69,527 |
$63,190
785,147
kWh
|
$2,470 |
$(-3,728.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,657 | $5,249 |
$1,595
19,815
kWh
|
$62 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs