ITAC Assessment: UA0172
ITAC logo
ITAC Assessment: UA0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Acoustic Carpet
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 80,000
ft2
Annual Production 900,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,613 3,253,000
kWh
Electricity Demand $83,093 7,092
kW-mo/yr
Electricity Fees $31,636 -
Natural Gas $16,770 2,117
MMBtu
TOTAL YEARLY COSTS $360,112
RECOMMENDED SAVINGS* $47,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4226: Use / purchase optimum sized compressor $17,454 $37,500 $12,532
178,309
kWh
$3,314
-
kW-mo/yr
$1,608
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,564 $250 $3,989
56,753
kWh
$1,062
-
kW-mo/yr
$513
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,803 $2,670 $5,337
75,932
kWh
$839
-
kW-mo/yr
$627
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,901 $33,960 $7,429
105,710
kWh
$2,468
-
kW-mo/yr
$1,004
05 2.7261: Install timers and/or thermostats $6,624 $1,050 $6,014
85,583
kWh
- $610
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $529 $210 $331
4,717
kWh
$149
-
kW-mo/yr
$49
TOTAL RECOMMENDED $47,875 $75,640 $35,632
507,004
kWh
$7,832
-
kW-mo/yr
$4,411
TOTAL IMPLEMENTED $13,956 $3,930 $11,682
166,232
kWh
$988
-
kW-mo/yr
$1,286
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs