ITAC Assessment: UA0158
ITAC logo
ITAC Assessment: UA0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Office Furniture
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2522: Office Furniture, Except Wood
Sales Range greater than $500
M
# of Employees 895
Plant Area 889,425
ft2
Annual Production 339,843
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,591,161 25,473,600
kWh
Electricity Demand $1,076,720 55,760
kW-mo/yr
Electricity Fees $(-337,970.0) -
Natural Gas $1,018,754 117,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $669,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $283,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2425: Use flue gases to heat process or service water $226,961 $70,000 - - - $226,961
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $148,298 $25,908 $106,652
1,707,525
kWh
$63,414
-
kW-mo/yr
$(-21,768.0) -
03 2.7134: Use photocell controls $5,176 $8,087 $5,936
95,040
kWh
- $(-760.0) -
04 2.7135: Install occupancy sensors $3,524 $11,746 $4,041
64,696
kWh
- $(-517.0) -
05 2.4226: Use / purchase optimum sized compressor $74,344 $60,000 $58,918
943,290
kWh
$26,339
-
kW-mo/yr
$(-10,913.0) -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,548 $2,995 $18,660
298,745
kWh
$19,812
-
kW-mo/yr
$(-4,924.0) -
07 2.4231: Reduce the pressure of compressed air to the minimum required $16,549 $700 $11,891
190,385
kWh
$7,087
-
kW-mo/yr
$(-2,429.0) -
08 2.7261: Install timers and/or thermostats $155,322 $3,450 $5,417
86,729
kWh
- $(-69.0) $149,974
-
MMBtu
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,250 $1,800 $4,310
69,012
kWh
$2,858
-
kW-mo/yr
$(-918.0) -
TOTAL RECOMMENDED $669,972 $184,686 $215,825
3,455,422
kWh
$119,510
-
kW-mo/yr
$(-42,298.0) $376,935
-
MMBtu
TOTAL IMPLEMENTED $283,308 $75,495 $34,861
558,142
kWh
$29,757
-
kW-mo/yr
$(-8,271.0) $226,961
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs