Assessment Year | 2015 |
---|---|
Principal Product | Car Door Interior Supplier |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
60,000
ft2
|
Annual Production | 3,000,000
units
|
Production Hrs. Annual | 2,550
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,382 | 1,339,200 |
kWh
|
$0.099 |
Electricity Demand | $18,462 | 3,895 |
kW-mo/yr
|
$4.74 |
Electricity Fees | $9,307 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,898 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,525 | $16,630 |
$25,644
259,422
kWh
|
$2,360
-
kW-mo/yr
|
$1,521 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,099 | $800 |
$2,643
26,736
kWh
|
$296
-
kW-mo/yr
|
$160 | |
03 | 2.4226: Use / purchase optimum sized compressor | $24,022 | $25,000 |
$20,818
210,602
kWh
|
$1,967
-
kW-mo/yr
|
$1,237 | |
04 | 2.3212: Optimize plant power factor | $1,140 | $2,140 | - |
$1,081
-
kW-mo/yr
|
$59 | |
05 | 2.7134: Use photocell controls | $458 | $959 |
$434
4,390
kWh
|
- | $24 | |
06 | 2.7261: Install timers and/or thermostats | $3,799 | $40 |
$3,603
36,451
kWh
|
- | $196 | |
TOTAL RECOMMENDED | $62,043 | $45,569 |
$53,142
537,601
kWh
|
$5,704
-
kW-mo/yr
|
$3,197 | ||
TOTAL IMPLEMENTED | $6,898 | $840 |
$6,246
63,187
kWh
|
$296
-
kW-mo/yr
|
$356 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs