ITAC Assessment: UA0143
ITAC logo
ITAC Assessment: UA0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Car Door Interior Supplier
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 60,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 2,550
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,382 1,339,200
kWh
Electricity Demand $18,462 3,895
kW-mo/yr
Electricity Fees $9,307 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,525 $16,630 $25,644
259,422
kWh
$2,360
-
kW-mo/yr
$1,521
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,099 $800 $2,643
26,736
kWh
$296
-
kW-mo/yr
$160
03 2.4226: Use / purchase optimum sized compressor $24,022 $25,000 $20,818
210,602
kWh
$1,967
-
kW-mo/yr
$1,237
04 2.3212: Optimize plant power factor $1,140 $2,140 - $1,081
-
kW-mo/yr
$59
05 2.7134: Use photocell controls $458 $959 $434
4,390
kWh
- $24
06 2.7261: Install timers and/or thermostats $3,799 $40 $3,603
36,451
kWh
- $196
TOTAL RECOMMENDED $62,043 $45,569 $53,142
537,601
kWh
$5,704
-
kW-mo/yr
$3,197
TOTAL IMPLEMENTED $6,898 $840 $6,246
63,187
kWh
$296
-
kW-mo/yr
$356
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs