Assessment Year | 2013 |
---|---|
Principal Product | Plastic Components |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 52 |
Plant Area |
40,000
ft2
|
Annual Production | 22,000,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $189,135 | 2,691,300 |
kWh
|
$0.070 |
Electricity Demand | $8,009 | 6,407 |
kW-mo/yr
|
$1.25 |
Electricity Fees | $10,500 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,636 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,064 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $13,079 | - |
$12,470
177,433
kWh
|
- | $609 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $817 | $996 |
$779
11,090
kWh
|
- | $38 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,715 | $39,573 |
$11,739
167,033
kWh
|
$384
-
kW-mo/yr
|
$592 | |
04 | 2.7135: Install occupancy sensors | $1,997 | $545 |
$1,904
27,087
kWh
|
- | $93 | |
05 | 2.7261: Install timers and/or thermostats | $3,456 | $1,320 |
$3,295
46,882
kWh
|
- | $161 | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $766 | $8 |
$730
14,230
kWh
|
- | $36 | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $485 | $400 |
$437
6,213
kWh
|
$25
-
kW-mo/yr
|
$23 | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $321 | $1,000 |
$292
4,159
kWh
|
$14
-
kW-mo/yr
|
$15 | |
TOTAL RECOMMENDED | $33,636 | $43,842 |
$31,646
454,127
kWh
|
$423
-
kW-mo/yr
|
$1,567 | ||
TOTAL IMPLEMENTED | $32,064 | $42,434 |
$30,187
429,525
kWh
|
$384
-
kW-mo/yr
|
$1,493 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs