| Assessment Year | 2019 |
|---|---|
| Principal Product | Small diameter pipes |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
414,141
ft2
|
| Annual Production | 192,000
ton
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,196,134 | 29,904,336 |
kWh
|
$0.040 | |
| Electricity Demand | $882,677 | 81,022 |
kW-mo/yr
|
$10.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $300,340 | 28,612 |
Tgal
|
$10.50 | |
| TOTAL YEARLY COSTS | $2,379,151 | ||||
| RECOMMENDED SAVINGS* | $362,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $76,891 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,284 | $4,982 |
$13,034
325,853
kWh
|
- | $(-1,750.0) | - | |
| 02 | 2.6218: Turn off equipment when not in use | $14,945 | - |
$14,945
373,634
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60,608 | $35,153 |
$44,142
1,103,549
kWh
|
$16,466
-
kW-mo/yr
|
- | - | |
| 04 | 2.4131: Size electric motors for peak operating efficiency | $5,610 | $6,480 |
$1,711
42,771
kWh
|
$3,899
-
kW-mo/yr
|
- | - | |
| 05 | 3.4159: Replace treated water with well / surface water | $264,923 | $206,847 |
$(-1,761.0)
(-44,032)
kWh
|
$(-947.0)
-
kW-mo/yr
|
- | $267,631 | |
| 06 | 2.7211: Clean and maintain refrigerant condensers and towers | $4,999 | $4,520 |
$3,638
90,947
kWh
|
$1,361
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $362,369 | $257,982 |
$75,709
1,892,722
kWh
|
$20,779
-
kW-mo/yr
|
$(-1,750.0) | $267,631 | ||
| TOTAL IMPLEMENTED | $76,891 | $44,655 |
$60,814
1,520,349
kWh
|
$17,827
-
kW-mo/yr
|
$(-1,750.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs