ITAC Assessment: UA0078
ITAC logo
ITAC Assessment: UA0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Vehicle FEM, HVAC, Radiators, Condensers
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 377
Plant Area 252,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $917,629 16,928,870
kWh
Electricity Demand $197,752 48,123
kW-mo/yr
Electricity Fees $56,001 -
LPG $291,515 13,945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $319,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
01 2.1331: Burn a less expensive grade of fuel $217,328 $9,277 - - - $(-74,187.0)
-
MMBtu
$291,515
-
MMBtu
02 2.3212: Optimize plant power factor $59,117 $13,031 - $56,356
-
kW-mo/yr
$2,761 - -
03 2.4224: Upgrade controls on compressors $15,318 $30,000 $13,316
245,686
kWh
$1,287
-
kW-mo/yr
$715 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,672 $9,195 $9,015
166,329
kWh
$1,159
-
kW-mo/yr
$498 - -
05 2.7442: Keep doors and windows shut when not on use $10,180 - $9,703
179,021
kWh
- $477 - -
06 2.7423: Reduce heat gain by window tinting $4,732 $16,800 $4,510
83,200
kWh
- $222 - -
07 2.7135: Install occupancy sensors $2,072 $1,706 $1,975
36,442
kWh
- $97 - -
TOTAL RECOMMENDED $319,419 $80,009 $38,519
710,678
kWh
$58,802
-
kW-mo/yr
$4,770 $(-74,187.0)
-
MMBtu
$291,515
-
MMBtu
TOTAL IMPLEMENTED $22,924 $10,901 $20,693
381,792
kWh
$1,159
-
kW-mo/yr
$1,072 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs