ITAC Assessment: UA0074
ITAC logo
ITAC Assessment: UA0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $5
M
to 10
M
# of Employees 98
Plant Area 130,000
ft2
Annual Production 1,275
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,650 1,513,600
kWh
Electricity Demand $76,516 7,124
kW-mo/yr
Electricity Fees $10,281 -
Natural Gas $69,783 6,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,718 $480 $2,795
41,214
kWh
$1,698
-
kW-mo/yr
$225 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,736 $2,500 $1,543
22,746
kWh
$110
-
kW-mo/yr
$83 -
03 2.4226: Use / purchase optimum sized compressor $2,094 $1,680 $2,394
35,301
kWh
$(-400.0)
-
kW-mo/yr
$100 -
04 2.2437: Recover waste heat from equipment $1,815 $539 - - $70 $1,745
-
MMBtu
05 2.7231: Use radiant heater for spot heating $4,712 $4,728 - - $181 $4,531
-
MMBtu
06 2.7261: Install timers and/or thermostats $5,313 $2,040 $5,060
74,614
kWh
- $253 -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,847 $2 $1,759
25,937
kWh
- $88 -
TOTAL RECOMMENDED $22,235 $11,969 $13,551
199,812
kWh
$1,408
-
kW-mo/yr
$1,000 $6,276
-
MMBtu
TOTAL IMPLEMENTED $8,301 $2,982 $6,097
89,897
kWh
$1,808
-
kW-mo/yr
$396 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs