| Assessment Year | 2012 |
|---|---|
| Principal Product | Trailers |
| NAICS | 336212: Truck Trailer Manufacturing |
| SIC | 3715: Truck Trailers |
| Sales Range | $5 M to 10M |
| # of Employees | 98 |
| Plant Area |
130,000
ft2
|
| Annual Production | 1,275
pieces
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,650 | 1,513,600 |
kWh
|
$0.068 |
| Electricity Demand | $76,516 | 7,124 |
kW-mo/yr
|
$10.74 |
| Electricity Fees | $10,281 | - |
|
- |
| Natural Gas | $69,783 | 6,187 |
MMBtu
|
$11.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,235 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,301 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,718 | $480 |
$2,795
41,214
kWh
|
$1,698
-
kW-mo/yr
|
$225 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,736 | $2,500 |
$1,543
22,746
kWh
|
$110
-
kW-mo/yr
|
$83 | - | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $2,094 | $1,680 |
$2,394
35,301
kWh
|
$(-400.0)
-
kW-mo/yr
|
$100 | - | |
| 04 | 2.2437: Recover waste heat from equipment | $1,815 | $539 | - | - | $70 |
$1,745
-
MMBtu
|
|
| 05 | 2.7231: Use radiant heater for spot heating | $4,712 | $4,728 | - | - | $181 |
$4,531
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $5,313 | $2,040 |
$5,060
74,614
kWh
|
- | $253 | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,847 | $2 |
$1,759
25,937
kWh
|
- | $88 | - | |
| TOTAL RECOMMENDED | $22,235 | $11,969 |
$13,551
199,812
kWh
|
$1,408
-
kW-mo/yr
|
$1,000 |
$6,276
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,301 | $2,982 |
$6,097
89,897
kWh
|
$1,808
-
kW-mo/yr
|
$396 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs