ITAC Assessment: UM0229
ITAC logo
ITAC Assessment: UM0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Coating Automotive Parts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 486,530
ft2
Annual Production 0
units
Production Hrs. Annual 2,280
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,042 1,902,511
kWh
Electricity Demand $82,877 6,588
kW-mo/yr
Electricity Fees $(-6,041.0) -
Natural Gas $17,512 3,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,914 $100,000 $19,568
284,000
kWh
$5,396
-
kW-mo/yr
$(-6,050.0)
-
MMBtu
02 2.7491: Insulate glazing, walls, ceilings, and roofs $2,030 $5,280 - - $2,030
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,440 $6,423 $1,032
14,986
kWh
$1,408
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,970 $300 $1,272
18,464
kWh
$698
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,354 $112,003 $21,872
317,450
kWh
$7,502
-
kW-mo/yr
$(-4,020.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs