Assessment Year | 2007 |
---|---|
Principal Product | Automotive subframes and bumpers |
NAICS | 336111: Automobile Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 308 |
Plant Area |
144,000
ft2
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $678,674 | 8,641,690 |
kWh
|
$0.079 |
Electricity Demand | $114,338 | 17,690 |
kW-mo/yr
|
$6.46 |
Natural Gas | $215,659 | 23,716 |
MMBtu
|
$9.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $65,640 | $16,926 | - | - | - |
$65,640
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,585 | $54,205 |
$24,920
407,410
kWh
|
$4,270
-
kW-mo/yr
|
$1,395 | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $43,286 | $20,950 |
$35,571
581,610
kWh
|
$5,723
-
kW-mo/yr
|
$1,992 | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,528 | - |
$1,528
24,986
kWh
|
- | - | - | |
05 | 2.7442: Keep doors and windows shut when not on use | $1,563 | - |
$375
11,688
kWh
|
- | - |
$1,188
-
MMBtu
|
|
06 | 2.2625: Chill water to the highest temperature possible | $1,422 | - |
$1,093
18,024
kWh
|
$268
-
kW-mo/yr
|
$61 | - | |
07 | 2.7261: Install timers and/or thermostats | $814 | $1,180 |
$814
13,300
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $166 | $158 |
$166
2,566
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $145,004 | $93,419 |
$64,467
1,059,584
kWh
|
$10,261
-
kW-mo/yr
|
$3,448 |
$66,828
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs