ITAC Assessment: OR0536
ITAC logo
ITAC Assessment: OR0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Printers
NAICS 423690: Other Electronic Parts and Equipment Merchant Wholesalers
SIC 5065: Electronic Parts and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 1,500
Plant Area 202,800
ft2
Annual Production 24,700
pieces
Production Hrs. Annual 3,952
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,373 3,148,616
kWh
Electricity Demand $27,862 7,918
kW-mo/yr
Electricity Fees $7,773 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,018

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $18,938 $27,195 $18,938
12,487
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,213 - $1,213
17,826
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $6,256 - $6,256
99,931
kWh
-
04 2.9113: Use solar heat for heat $127,842 $530,836 $127,842
1,898,208
kWh
-
05 2.4133: Use most efficient type of electric motors $2,611 $6,927 $2,611
29,841
kWh
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $89,250 $7,000 - $89,250
07 2.7135: Install occupancy sensors $6,778 $15,745 $6,778
47,709
kWh
-
TOTAL RECOMMENDED $252,888 $587,703 $163,638
2,106,002
kWh
$89,250
TOTAL IMPLEMENTED $29,018 $34,122 $29,018
160,085
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs