ITAC Assessment: NC0663
ITAC logo
ITAC Assessment: NC0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 103,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,827 4,833,047
kWh
Electricity Demand $123,697 13,209
kW-mo/yr
Electricity Fees $2,602 -
Waste Disposal Costs
Water Usage $31,000 2,040
Tgal
TOTAL YEARLY COSTS $434,126
RECOMMENDED SAVINGS* $8,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,885 $3,168 $2,939
51,292
kWh
$946
-
kW-mo/yr
-
02 2.7134: Use photocell controls $191 $300 $132
2,300
kWh
$59
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,320 $8,144 $2,716
47,400
kWh
$2,662
-
kW-mo/yr
$(-1,058.0)
-
MMBtu
TOTAL RECOMMENDED $8,396 $11,612 $5,787
100,992
kWh
$3,667
-
kW-mo/yr
$(-1,058.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs