Assessment Year | 2025 |
---|---|
Principal Product | Handicap lifts, pool and custom rails, pool slides |
NAICS | 339920: Sporting and Athletic Goods Manufacturing |
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
166,000
ft2
|
Annual Production | 2,744,776
units
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $93,190 | 1,149,920 |
kWh
|
$0.081 | |
Electricity Demand | $42,684 | 4,410 |
kW-mo/yr
|
$9.68 | |
Electricity Fees | $22,234 | - |
|
- | |
Natural Gas | $104,914 | 14,712 |
MMBtu
|
$7.13 | |
LPG | $19,800 | 611 |
MMBtu
|
$32.43 | |
Waste Disposal Costs | |||||
Water Usage | $17,068 | 1,144 |
Tgal
|
$14.92 | |
Water Disposal | $29,262 | 1,144 |
Tgal
|
$25.59 | |
TOTAL YEARLY COSTS | $329,152 | ||||
RECOMMENDED SAVINGS* | $46,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.821: Pay bills on time to avoid late fees | $10,077 | - | - | - | $10,077 | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $7,793 | $70 | - | - | $7,793 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,948 | $33,315 |
$8,125
100,258
kWh
|
$2,823
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $6,325 | $21,000 |
$6,325
78,086
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,719 | $765 |
$3,719
45,925
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $3,038 | $5,000 | - | - | - |
$3,038
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,367 | $1,185 |
$1,615
19,938
kWh
|
$752
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,504 | $60 |
$1,504
18,563
kWh
|
- | - | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $303 | $435 |
$303
3,740
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $46,073 | $61,830 |
$21,591
266,510
kWh
|
$3,575
-
kW-mo/yr
|
$17,870 |
$3,038
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs