ITAC Assessment: TT0334
ITAC logo
ITAC Assessment: TT0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Handicap lifts, pool and custom rails, pool slides
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 166,000
ft2
Annual Production 2,744,776
units
Production Hrs. Annual 4,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,190 1,149,920
kWh
Electricity Demand $42,684 4,410
kW-mo/yr
Electricity Fees $22,234 -
Natural Gas $104,914 14,712
MMBtu
LPG $19,800 611
MMBtu
Waste Disposal Costs
Water Usage $17,068 1,144
Tgal
Water Disposal $29,262 1,144
Tgal
TOTAL YEARLY COSTS $329,152
RECOMMENDED SAVINGS* $46,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 4.821: Pay bills on time to avoid late fees $10,077 - - - $10,077 -
02 2.8121: Apply for tax-free status for energy purchases $7,793 $70 - - $7,793 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,948 $33,315 $8,125
100,258
kWh
$2,823
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $6,325 $21,000 $6,325
78,086
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,719 $765 $3,719
45,925
kWh
- - -
06 2.2437: Recover waste heat from equipment $3,038 $5,000 - - - $3,038
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,367 $1,185 $1,615
19,938
kWh
$752
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,504 $60 $1,504
18,563
kWh
- - -
09 2.6231: Utilize controls to operate equipment only when needed $303 $435 $303
3,740
kWh
- - -
TOTAL RECOMMENDED $46,073 $61,830 $21,591
266,510
kWh
$3,575
-
kW-mo/yr
$17,870 $3,038
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs