| Assessment Year | 2018 |
|---|---|
| Principal Product | Wastewater Treatment Facility |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 29 |
| Plant Area |
1,061,340
ft2
|
| Annual Production | 2,409,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,209 | 5,300,207 |
kWh
|
$0.044 |
| Electricity Demand | $39,074 | 19,793 |
kW-mo/yr
|
$1.97 |
| Electricity Fees | $45,923 | - |
|
- |
| Natural Gas | $27,049 | 5,082 |
MMBtu
|
$5.32 |
| TOTAL YEARLY COSTS | $345,255 | |||
| RECOMMENDED SAVINGS* | $226,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $216,698 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $208,328 | $305,915 |
$179,798
3,802,830
kWh
|
$28,530
-
kW-mo/yr
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,691 | $11,397 |
$8,278
165,564
kWh
|
$413
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,439 | $9,545 |
$5,439
113,267
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,551 | $2,023 |
$1,423
30,091
kWh
|
$128
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,380 | $422 |
$1,310
27,698
kWh
|
$70
-
kW-mo/yr
|
|
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $768 | - | - |
$768
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $226,157 | $329,302 |
$196,248
4,139,450
kWh
|
$29,909
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $216,698 | $317,905 |
$187,970
3,973,886
kWh
|
$28,728
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs