ITAC Assessment: IC0201
ITAC logo
ITAC Assessment: IC0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wastewater Treatment Facility
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 29
Plant Area 1,061,340
ft2
Annual Production 2,409,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,209 5,300,207
kWh
Electricity Demand $39,074 19,793
kW-mo/yr
Electricity Fees $45,923 -
Natural Gas $27,049 5,082
MMBtu
TOTAL YEARLY COSTS $345,255
RECOMMENDED SAVINGS* $226,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $216,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4226: Use / purchase optimum sized compressor $208,328 $305,915 $179,798
3,802,830
kWh
$28,530
-
kW-mo/yr
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,691 $11,397 $8,278
165,564
kWh
$413
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,439 $9,545 $5,439
113,267
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,551 $2,023 $1,423
30,091
kWh
$128
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $422 $1,310
27,698
kWh
$70
-
kW-mo/yr
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $768 - - $768
-
kW-mo/yr
TOTAL RECOMMENDED $226,157 $329,302 $196,248
4,139,450
kWh
$29,909
-
kW-mo/yr
TOTAL IMPLEMENTED $216,698 $317,905 $187,970
3,973,886
kWh
$28,728
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs