Assessment Year | 2021 |
---|---|
Principal Product | Torque Convertors |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 366 |
Plant Area |
500,000
ft2
|
Annual Production | 1,040,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,530,647 | 24,757,068 |
kWh
|
$0.062 | |
Electricity Demand | $828,529 | 101,977 |
kW-mo/yr
|
$8.12 | |
Natural Gas | $422,351 | 52,057 |
MMBtu
|
$8.11 | |
Waste Disposal Costs | |||||
Water Usage | $70,034 | 12,427 |
Tgal
|
$5.64 | |
Water Disposal | $6,944 | 288 |
Tgal
|
$24.11 | |
TOTAL YEARLY COSTS | $2,858,505 | ||||
RECOMMENDED SAVINGS* | $421,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $372,885 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $300,781 | $111,421 |
$254,899
4,122,585
kWh
|
$45,882
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $62,325 | $1,640 |
$62,325
1,008,000
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,112 | $13,000 |
$30,399
491,904
kWh
|
$713
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,779 | $2,738 |
$9,779
158,301
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,579 | $16,000 |
$6,385
102,984
kWh
|
$1,194
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $5,951 | $1,314 | - | - |
$5,951
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,907 | $5,500 |
$1,907
30,873
kWh
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $1,752 | $400 |
$1,752
28,329
kWh
|
- | - | |
TOTAL RECOMMENDED | $421,186 | $152,013 |
$367,446
5,942,976
kWh
|
$47,789
-
kW-mo/yr
|
$5,951
-
MMBtu
|
||
TOTAL IMPLEMENTED | $372,885 | $115,799 |
$327,003
5,288,886
kWh
|
$45,882
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs