ITAC Assessment: TT0259
ITAC logo
ITAC Assessment: TT0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Torque Convertors
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 366
Plant Area 500,000
ft2
Annual Production 1,040,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,530,647 24,757,068
kWh
Electricity Demand $828,529 101,977
kW-mo/yr
Natural Gas $422,351 52,057
MMBtu
Waste Disposal Costs
Water Usage $70,034 12,427
Tgal
Water Disposal $6,944 288
Tgal
TOTAL YEARLY COSTS $2,858,505
RECOMMENDED SAVINGS* $421,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $372,885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $300,781 $111,421 $254,899
4,122,585
kWh
$45,882
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $62,325 $1,640 $62,325
1,008,000
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,112 $13,000 $30,399
491,904
kWh
$713
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,779 $2,738 $9,779
158,301
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,579 $16,000 $6,385
102,984
kWh
$1,194
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $5,951 $1,314 - - $5,951
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,907 $5,500 $1,907
30,873
kWh
- -
08 2.7261: Install timers and/or thermostats $1,752 $400 $1,752
28,329
kWh
- -
TOTAL RECOMMENDED $421,186 $152,013 $367,446
5,942,976
kWh
$47,789
-
kW-mo/yr
$5,951
-
MMBtu
TOTAL IMPLEMENTED $372,885 $115,799 $327,003
5,288,886
kWh
$45,882
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs