ITAC Assessment: TT0234
ITAC logo
ITAC Assessment: TT0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Hair Clippers
NAICS 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing
SIC 3421: Cutlery
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 165,000
ft2
Annual Production 32,800,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $578,781 9,082,500
kWh
Electricity Demand $259,891 20,634
kW-mo/yr
Natural Gas $34,309 5,687
MMBtu
Waste Disposal Costs
Water Usage $20,317 3,907,000
Tgal
Water Disposal $23,833 3,907
Tgal
TOTAL YEARLY COSTS $917,131
RECOMMENDED SAVINGS* $33,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7261: Install timers and/or thermostats $18,933 $450 $18,920
297,017
kWh
- $13
-
MMBtu
-
02 2.4226: Use / purchase optimum sized compressor $6,187 $15,000 $6,187
97,135
kWh
- - -
03 3.4116: Meter recycled water (to reduce sewer charges) $3,742 $3,800 - - - $3,742
-
Tgal
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,207 $3,000 $2,013
31,600
kWh
$1,194
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,041 $3,675 $663
10,400
kWh
$378
-
kW-mo/yr
- -
TOTAL RECOMMENDED $33,110 $25,925 $27,783
436,152
kWh
$1,572
-
kW-mo/yr
$13
-
MMBtu
$3,742
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs