Assessment Year | 2019 |
---|---|
Principal Product | Hair Clippers |
NAICS | 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing |
SIC | 3421: Cutlery |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
165,000
ft2
|
Annual Production | 32,800,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $578,781 | 9,082,500 |
kWh
|
$0.064 | |
Electricity Demand | $259,891 | 20,634 |
kW-mo/yr
|
$12.60 | |
Natural Gas | $34,309 | 5,687 |
MMBtu
|
$6.03 | |
Waste Disposal Costs | |||||
Water Usage | $20,317 | 3,907,000 |
Tgal
|
$0.005 | |
Water Disposal | $23,833 | 3,907 |
Tgal
|
$6.10 | |
TOTAL YEARLY COSTS | $917,131 | ||||
RECOMMENDED SAVINGS* | $33,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $18,933 | $450 |
$18,920
297,017
kWh
|
- |
$13
-
MMBtu
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $6,187 | $15,000 |
$6,187
97,135
kWh
|
- | - | - | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,742 | $3,800 | - | - | - |
$3,742
-
Tgal
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,207 | $3,000 |
$2,013
31,600
kWh
|
$1,194
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,041 | $3,675 |
$663
10,400
kWh
|
$378
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $33,110 | $25,925 |
$27,783
436,152
kWh
|
$1,572
-
kW-mo/yr
|
$13
-
MMBtu
|
$3,742
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs