Assessment Year 2016
Principal Product Non-Fat Dried Milk Powder
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 67,900
ft2
Annual Production 23,100,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $651,381 8,870,400
kWh
Electricity Demand $217,231 21,264
kW-mo/yr
Electricity Fees $42 -
Natural Gas $626,939 106,321
MMBtu
TOTAL YEARLY COSTS $1,495,593
RECOMMENDED SAVINGS* $115,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.5194: Redesign process $69,240 $103,200 $29,740
424,800
kWh
$8,680
-
kW-mo/yr
$30,820
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,460 $2,220 $4,370
62,400
kWh
$1,090
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,110 $570 $4,260
60,800
kWh
$850
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $4,560 $3,590 - - $4,560
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $31,330 $46,120 $27,080
386,800
kWh
$5,620
-
kW-mo/yr
- $670 $(-2,040.0)
TOTAL RECOMMENDED $115,700 $155,700 $65,450
934,800
kWh
$16,240
-
kW-mo/yr
$35,380
-
MMBtu
$670 $(-2,040.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs