| Assessment Year | 2016 |
|---|---|
| Principal Product | Non-Fat Dried Milk Powder |
| NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
| SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
| Sales Range | $10 M to 50M |
| # of Employees | 46 |
| Plant Area |
67,900
ft2
|
| Annual Production | 23,100,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $651,381 | 8,870,400 |
kWh
|
$0.073 |
| Electricity Demand | $217,231 | 21,264 |
kW-mo/yr
|
$10.22 |
| Electricity Fees | $42 | - |
|
- |
| Natural Gas | $626,939 | 106,321 |
MMBtu
|
$5.90 |
| TOTAL YEARLY COSTS | $1,495,593 | |||
| RECOMMENDED SAVINGS* | $115,700 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.5194: Redesign process | $69,240 | $103,200 |
$29,740
424,800
kWh
|
$8,680
-
kW-mo/yr
|
$30,820
-
MMBtu
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,460 | $2,220 |
$4,370
62,400
kWh
|
$1,090
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,110 | $570 |
$4,260
60,800
kWh
|
$850
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $4,560 | $3,590 | - | - |
$4,560
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,330 | $46,120 |
$27,080
386,800
kWh
|
$5,620
-
kW-mo/yr
|
- | $670 | $(-2,040.0) | |
| TOTAL RECOMMENDED | $115,700 | $155,700 |
$65,450
934,800
kWh
|
$16,240
-
kW-mo/yr
|
$35,380
-
MMBtu
|
$670 | $(-2,040.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs