Assessment Year | 2019 |
---|---|
Principal Product | Fiberglass truck bodies |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
300,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,055,144 | 25,903,000 |
kWh
|
$0.041 |
Electricity Demand | $485,029 | 52,355 |
kW-mo/yr
|
$9.26 |
Natural Gas | $540,776 | 129,834 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | $2,080,949 | |||
RECOMMENDED SAVINGS* | $24,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,442 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $483 | $600 |
$350
8,609
kWh
|
$133
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,794 | $30,000 |
$5,260
129,246
kWh
|
$4,534
-
kW-mo/yr
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $2,154 | $3,120 | - | - |
$2,154
-
MMBtu
|
|
04 | 2.2135: Repair and eliminate steam leaks | $2,165 | $850 | - | - |
$2,165
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $9,539 | $12,600 | - | - |
$9,539
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,135 | $47,170 |
$5,610
137,855
kWh
|
$4,667
-
kW-mo/yr
|
$13,858
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,442 | $31,450 |
$5,610
137,855
kWh
|
$4,667
-
kW-mo/yr
|
$2,165
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs