Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fiberglass truck bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 300,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,055,144 25,903,000
kWh
Electricity Demand $485,029 52,355
kW-mo/yr
Natural Gas $540,776 129,834
MMBtu
TOTAL YEARLY COSTS $2,080,949
RECOMMENDED SAVINGS* $24,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $483 $600 $350
8,609
kWh
$133
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,794 $30,000 $5,260
129,246
kWh
$4,534
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $2,154 $3,120 - - $2,154
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $2,165 $850 - - $2,165
-
MMBtu
05 2.2511: Insulate bare equipment $9,539 $12,600 - - $9,539
-
MMBtu
TOTAL RECOMMENDED $24,135 $47,170 $5,610
137,855
kWh
$4,667
-
kW-mo/yr
$13,858
-
MMBtu
TOTAL IMPLEMENTED $12,442 $31,450 $5,610
137,855
kWh
$4,667
-
kW-mo/yr
$2,165
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs